Case Studies

Trusted by India's Top EPC & Industrial Leaders

Siddhi Infra Client Projects

Real deployments for L&T, Adani, Essar, Reliance, Cairn, Brio and government tender buyers — showing how we match product spec to project conditions, and deliver on tight mobilisation windows.

L&T Construction Adani Group Essar Group Brio Group
Construction
L&T Construction

Mumbai Coastal Road — Package BKC South

📍 Mumbai, Maharashtra
Products Deployed
40× FRP Portable Toilets · 8× PUF Bunk Houses (stacked 2-high) · 4× Security Cabins · 2× Site Office Containers
The Challenge
Compact urban site with zero-footprint-to-spare — needed stackable labour accommodation that could handle monsoon-grade waterproofing and saline coastal air. Mobilisation window: 11 days from PO.
Our Solution
Manufactured 50 mm PUF sandwich-panel cabins with corrosion-resistant GI cladding + galvanised MS frame. Stacked 2 levels high with external staircase. Delivered in 11 days across 4 trucks.
The Outcome
Zero downtime through 2023 monsoon season. Labour accommodation relocated intact to Package BKC North in 2024. Structural integrity holding at 24+ months in service.
Port / Industrial
Adani Ports & SEZ

Mundra Port Expansion — Phase IV Labour Camp

📍 Mundra, Gujarat
Products Deployed
120× PUF Bunk Houses · 25× FRP Toilet Blocks · 8× Office Containers · 6× Security Cabins
The Challenge
Large-scale camp for 900 workers in saline coastal air (highest corrosion exposure). Required flood-elevation foundations, cyclone-wind resistance per IS 875 Part 3.
Our Solution
Hot-dip galvanised MS frames with PU-coated exterior, cyclone-spec wind anchoring, raised 600 mm concrete plinth for flood-safety. Staged dispatch across 10 weeks.
The Outcome
Camp operational since 2023. Cleared 2 Adani HSE audits. Zero corrosion defects at 18-month inspection. Structural warranty renewed for extended period.
Oil & Gas
Essar Group

Hazira Steel Plant Shutdown Maintenance — 2024

📍 Hazira, Surat, Gujarat
Products Deployed
60× Flame-retardant PUF Cabins · 15× Security Cabins · 30× FRP Bio-Toilets
The Challenge
Planned 45-day shutdown with 600 contract workers entering a Zone-2 classified area. Required HSE-compliant flame-retardant cabins with spark-arrestor electricals.
Our Solution
Supplied B2-class flame-retardant PUF panels, IE Rules 1956-compliant electricals, blast-resistant cladding at Zone-2 boundary. Full HSE documentation package submitted pre-delivery.
The Outcome
Shutdown completed on schedule with zero safety incidents. Essar HSE committee empanelled Siddhi Infra on preferred vendor list for subsequent turnaround projects.
Real-Estate
Brio Group

Commercial Real-Estate Site Offices — Multi-City

📍 Ahmedabad & Gandhinagar
Products Deployed
12× Branded Office Containers (with AC + partitions) · 6× Porta Toilet Cabins
The Challenge
Required white-glove executive site-offices with Brio corporate-identity wrap, split-AC, partitioned cabins, meeting rooms — ready to host potential investors and buyers at plot-launches.
Our Solution
Custom fit-out: vinyl-wrapped exterior in Brio orange, internal glass partitions, LED panel lights, carpet flooring, dedicated 15A circuits for AC. 18-day delivery.
The Outcome
Used at 4 plot-launch events across Ahmedabad-Gandhinagar region in 2024. Repeat orders placed for 2025 site launches.
Government
Gujarat PWD

State Highway Rest-Stop Bio-Toilets — Tender 2024

📍 Gujarat Statewide (18 locations)
Products Deployed
42× Bio-Digester Toilet Blocks (Gender-segregated, Disabled-accessible)
The Challenge
Remote highway rest-stops without sewer connectivity. Required CPCB-approved bio-digester tanks + disabled-accessible ramp per MoRTH Harmonised 2016 + overhead water tanks + solar-ready roofs.
Our Solution
MoRD Swachh Bharat-spec bio toilets with 5-year bacterial culture life. Staged delivery across 18 locations over 60 days. Full GEM tender compliance file including ISO, MSME, GST, test reports.
The Outcome
On-time delivery across all 18 lots. Zero penalty deductions. Received renewal tender for 2025 highway phase-II package.
Oil & Gas
Cairn Oil & Gas (Vedanta)

Barmer Oilfield Operator Shelters

📍 Barmer, Rajasthan
Products Deployed
28× 75mm-PUF Control-Room Cabins · 12× Security Cabins · 18× Insulated PUF Toilets
The Challenge
Summer temperatures hit 48°C at Barmer oilfields. Units needed 75 mm PUF insulation, solar-ready roofs for off-grid stretches, sandstorm-proof door seals, and 5-year structural warranty for continuous operation.
Our Solution
Specified 75 mm PUF sandwich panels with reflective GI cladding, pre-wired split-AC provisions, rubber gasket door seals, solar-ready MCB panel. Delivery in 21 days.
The Outcome
Interior temperature held 14-18°C below ambient through 2024 summer peak. Approved on Cairn vendor list for pipeline-pushed expansions.
Events / Govt
Sabarmati Riverfront Development Corp

Riverfront Event Sanitation — Multiple Events 2024

📍 Ahmedabad, Gujarat
Products Deployed
24× FRP Portable Toilets · 4× Mobile Toilet Vans (2-seater VIP) · 8× Bio Toilets (zero-discharge for waterfront)
The Challenge
Events at waterfront venue required zero-discharge sanitation (no sewer dumping permitted adjacent to Sabarmati). Needed rapid-deploy bio-digester units + VIP vans for political dignitaries.
Our Solution
CPCB-compliant bio-digester FRP units + AC-equipped VIP mobile vans with stainless fittings. On-site servicing crew for 3-day event windows. Rentable with buy-back option.
The Outcome
Supported 6 events in 2024 including state government functions. Zero pollution incidents. Repeat bookings for 2025 event calendar.
Oil & Gas
Reliance Industries — Dahej Petrochem

Dahej Expansion — HSE-Compliant Operator Shelters

📍 Dahej, Bharuch, Gujarat
Products Deployed
35× Flame-retardant PUF Cabins · 14× Security Cabins · 22× PUF Toilets
The Challenge
Reliance HSE Tier-1 vendor requirements: B1-class flame-retardant panels, IE Rules 1956 electricals, positive-pressure HVAC provisions, 3 psi blast-rating cladding for Zone-2 classified areas adjacent to petrochem units.
Our Solution
Upgraded to B1-class panels (vs standard B2), reinforced cladding, welded-joint construction (no bolted for vibration-heavy zone), full Reliance HSE compliance file including third-party structural certification.
The Outcome
Empanelled on Reliance framework agreement — rolling orders for 2024-26 expansion phases. First project delivered in 18 days.

We have more then
30 outlets Pan India

Scan the QR to call

©2023 All Rights Reserved to Siddhi Infra | Design & Developed by Clients Now Technologies

Website Updated On : 25 April 2026